Friday, October 2, 2009

2OCTOBER2009

Today we worked at the control room in the segoale dam,we were busy with the painting of the control room.We started first by scrabbing the walls using sand paper and chisels,then we used poly filla to close some of the holes on wall.After that we mixed the paint and poured it in the tray,then we started painting using paint brush and rollers,we painted first and second code.
After we finished paint the wall,we went on to paint the floor.First we swept the floor with brooms,then we moped the floor with soap and water.We then mixed the paint and the paint hardener,after then we started painting using new paint brush and rollers,we painted first and second code.This will in the future help me if i am faced with the task of painting.
Hour after we finished painting we went to work in the mechanical work,we had to install four flourscent lights.We started by measuring the size of flourescent fittings and were they going to be installed,we drilled the holes for the fittings then mounted them on the wall using fischer plugs and spirit level then we pulled the wires through conduit pipes and connected the lights.We tested the installation and we installed the flourescent tubes and covers.we put on power after testing and everything was working well.This will in the future help me if I have to do installation.

No comments:

Post a Comment